
Designing for Compliance Without Designing to the Minimum
Regulations constrain design, and treating them as a checklist at the end produces worse buildings than designing with them from the start.
Read More30 articles in Architectural Design with practical commercial and delivery insight.

Regulations constrain design, and treating them as a checklist at the end produces worse buildings than designing with them from the start.
Read More
Most of a building's cost is decided before anyone prices it. The design choices that move the number most.
Read More
Bathrooms concentrate services, waterproofing and finishes in a small area. The errors that become permanent.
Read More
Renovation design can respect the existing structure or fight it. The cost and outcome of each approach.
Read More
Style is not only appearance. The choice affects cost, maintenance and how the building performs in this climate.
Read More
Gardens are designed for photographs and lived in for three months a year. Planning outdoor space around the climate.
Read More
Drawings describe what to build. Intent explains why, and it is what prevents reasonable site decisions from damaging the design.
Read More
Design proceeds through stages for a reason. What each produces, and the cost of skipping ahead.
Read More
Households change over twenty years and houses rarely do. The provisions that make later change possible, and what they cost now.
Read More
Lighting is usually a shopping decision made after the wiring is fixed. Reversing that order changes the result.
Read More
Approving drawings you cannot fully read means approving decisions you have not seen. What to check, and how.
Read More
Whether the structure is visible affects cost, ceiling heights, services and the character of the interior.
Read More