Lump Sum or Cost Plus? Choosing the Right Construction Contract in Saudi Arabia
Two pricing models, two very different ways of carrying risk. Here is how each behaves when drawings change, prices move or the programme slips.
Read More180 articles in Construction and Contracting with practical commercial and delivery insight.

Two pricing models, two very different ways of carrying risk. Here is how each behaves when drawings change, prices move or the programme slips.
Read More
Supervision is the first line owners try to delete from the budget. Six beliefs about it, tested against what actually happens on site.
Read More
Multi-unit construction rewards repetition and punishes variety. Where the money concentrates when you build to rent or sell.
Read More
Two common approaches to insulating walls in a hot climate, and what each one demands from detailing and site workmanship.
Read More
A selection process that picks a construction contract form from the state of your design and your appetite for risk, instead of defaulting to whatever the last project used.
Read More
How a monthly construction valuation is actually built: what is measured, how materials on site are treated, and what has to be agreed before a certificate can be issued.
Read More
Hoarding, gates, power, water, storage and setting out are temporary, but they fix the cost and safety of everything that follows. Here is the order a competent team works in.
Read More
A delay claim succeeds on contemporaneous records, not on argument. The sequence for assembling the file while the delay is happening rather than a year later.
Read More
Formwork holds the shape and carries the load until the concrete can carry itself. Striking it on habit rather than on evidence is a quiet cause of deflection and cracking.
Read More
How a main contractor divides a building into subcontract packages, where the scope gaps appear, and the sequence that closes them before anything is let.
Read More
Everything that leaks later was installed before the plaster went on. This is the first fix sequence, with the tests that have to happen while the pipes are still visible.
Read More
Air conditioning rarely fails because the equipment is poor. It fails because the pipework was brazed badly, never evacuated, or because the condensate has nowhere to go.
Read More