Lump Sum or Cost Plus? Choosing the Right Construction Contract in Saudi Arabia
Two pricing models, two very different ways of carrying risk. Here is how each behaves when drawings change, prices move or the programme slips.
Read More268 Construction & Development articles with practical guidance for projects and investments in Saudi Arabia.

Two pricing models, two very different ways of carrying risk. Here is how each behaves when drawings change, prices move or the programme slips.
Read More
Supervision is the first line owners try to delete from the budget. Six beliefs about it, tested against what actually happens on site.
Read More
Multi-unit construction rewards repetition and punishes variety. Where the money concentrates when you build to rent or sell.
Read More
Two common approaches to insulating walls in a hot climate, and what each one demands from detailing and site workmanship.
Read More
How to take a completed design to market and come back with comparable prices: shortlisting, documents, queries, returns and the analysis that follows.
Read More
The month between signing a construction contract and the first real progress decides how the rest of the build behaves. Here is the sequence to insist on.
Read More
Every month a contractor asks to be paid for work they say they have done. The certification process is where an absent owner keeps or loses control of the money.
Read More
Most monthly reports are a photograph album with a covering note. Here is the report that lets an owner in another country make decisions rather than react.
Read More
A selection process that picks a construction contract form from the state of your design and your appetite for risk, instead of defaulting to whatever the last project used.
Read More
Most of the work on your building will be done by companies you never contracted with. Six beliefs about that arrangement that cost owners money.
Read More
How a monthly construction valuation is actually built: what is measured, how materials on site are treated, and what has to be agreed before a certificate can be issued.
Read More
Hoarding, gates, power, water, storage and setting out are temporary, but they fix the cost and safety of everything that follows. Here is the order a competent team works in.
Read More