Turnkey or Shell Only? How Much of the Build You Should Hand Over
Handing the whole project to one contractor, or building the structure and finishing separately, changes cost, control and how long you stay involved.
Read More238 Construction & Development articles with practical guidance for projects and investments in Saudi Arabia.

Handing the whole project to one contractor, or building the structure and finishing separately, changes cost, control and how long you stay involved.
Read More
A condition survey is only useful if it names remaining lives, priorities and costs. The sequence for commissioning one that supports decisions rather than describing the obvious.
Read More
Safety on site is the contractor's duty to manage, but the consequences of failure reach the owner. The gaps that matter most.
Read More
Pipework replacement in an occupied building is priced by access, not by metres. Risers, concealed runs, making good and temporary supply dominate the bill.
Read More
Material waste, rework and idle time rarely appear as line items, yet they consume a real share of every construction budget.
Read More
Demolition looks like the simplest part of a project and carries some of its highest risks. The sequence that keeps it controlled.
Read More
Appoint one contractor for the whole works, or manage trade packages directly with a construction manager: how the two models allocate price risk.
Read More
Six beliefs about construction contracts that leave owners exposed, from what a signature covers to who owns the drawings and what a certificate means.
Read More
Delay analysis sounds like something for lawyers and experts. The first four steps are ordinary project work, and doing them early usually settles the question.
Read More
An owner who suspects the numbers have drifted can commission a review of the project accounts. Here is what such a review examines and what it costs to run.
Read More
Owners collect evidence that feels convincing and ignore the records that would actually settle an argument. Six beliefs worth correcting.
Read More
A prequalification questionnaire collects documents. Whether the contractor can deliver your particular project is a different question, and these are the gaps it usually leaves.
Read More