Reading a Construction Programme: A Worked Example of Where Time Hides
A programme is a claim about the future. This example shows how to test one before you accept it, using arithmetic rather than instinct.
Read More238 Construction & Development articles with practical guidance for projects and investments in Saudi Arabia.

A programme is a claim about the future. This example shows how to test one before you accept it, using arithmetic rather than instinct.
Read More
Condensation, rising moisture, a leaking pipe and penetrating rain look similar on a wall and need completely different treatment.
Read More
Contractor insolvency rarely arrives without notice. The signals that appear on site weeks before anyone admits there is a problem.
Read More
Owners assume a warranty means someone will come and fix it. The conditions, exclusions and notification requirements usually decide otherwise.
Read More
Six beliefs about how contracting works that cost overseas owners money, from fixed prices that are not fixed to turnkey deals that are not complete.
Read More
A contractor offers to recover six weeks for a price. Here is the arithmetic that tells an owner whether the offer is worth taking.
Read More
Paying for measured work each month and paying for completed stages are two different relationships with a contractor. Each protects a different thing.
Read More
Distance is not the real problem on a remote build. Beliefs about responsiveness, presence and trust cause far more damage than the hours between you.
Read More
A building that looks finished is not a building that works. What commissioning actually proves, and the beliefs that let owners skip it.
Read More
Bringing a contractor in before the design is finished can save money and time, or it can remove your competitive position. Six assumptions worth testing before you choose it.
Read More
Owners budget to build and assume operating cost starts small. The first year of a new building has costs that never appear again, and some that never stop.
Read More
The monthly comparison of what a contract has earned against what it has cost, worked through in illustrative riyals to show how a profitable job turns into a loss unnoticed.
Read More