
The Cost of Waiting: A Worked Example on Delaying a Purchase
Waiting to save a larger deposit has a cost that is rarely calculated. A comparison across a two year delay.
Read More1150 articles on construction, property, finance and technology.

Waiting to save a larger deposit has a cost that is rarely calculated. A comparison across a two year delay.
Read More
How a licensed property management company compares with a trusted individual representative for a foreign owner: control, cost, accountability and risk.
Read More
The final account is the last chance to settle a build correctly, and the point where owners give away positions they spent two years protecting.
Read More
Measures restraining residential rent increases in Riyadh change specific lines in an underwriting model. Here is which assumptions move, which do not, and what to verify.
Read More
Deposit, arrears, cleaning and damage, worked through on an illustrative tenancy so the arithmetic and the evidence requirements are both visible.
Read More
A step-by-step build-to-rent calculation for an apartment building: total cost, stabilised income, yield on cost, value at exit and the sensitivity that decides it.
Read More
The same property, bought two ways, producing two different returns and two different risk profiles.
Read More
The patterns behind property fraud aimed at foreign buyers in Saudi Arabia: fake listings, payment diversion, nominee schemes, false eligibility and guaranteed returns.
Read More
Three different measures of progress on the same building can differ by fifteen points. A worked example of how to reconcile them and which one to trust.
Read More
A breakdown of what it costs to buy and later sell a Saudi property, which items are negotiable, and how to get them into a model instead of discovering them later.
Read More
Most building disputes are small problems handled badly. The pattern that turns a leak or a parking argument into two years of hostility.
Read More
The costs between owning an empty commercial building and collecting stable rent in Saudi Arabia: fit-out contributions, rent-free periods, commissions, marketing and holding costs.
Read More