
The Red Sea Destination or AMAALA: Comparing Two Red Sea Global Projects
Both are developed by Red Sea Global, but they differ in positioning, scale and the suppliers and operators they need. A side-by-side view for investors.
Read More750 articles on construction, property, finance and technology.

Both are developed by Red Sea Global, but they differ in positioning, scale and the suppliers and operators they need. A side-by-side view for investors.
Read More
Renovation design can respect the existing structure or fight it. The cost and outcome of each approach.
Read More
Hosting the 2034 World Cup requires a surge of rooms and services. The cost lines of permanent and temporary capacity, and how investors keep them from outliving demand.
Read More
An open yard looks like the simplest thing to build and fails in the most expensive way. The errors in pavement, drainage, access and facilities, with the proof each is closed.
Read More
Remote destinations such as Red Sea Global and urban projects such as New Murabba create very different demand. How they compare for suppliers, operators and investors.
Read More
A good unit in a poorly run building is a poor purchase. What to assess beyond the four walls you are buying.
Read More
Two ways into the Saudi sports sector compared: owning a sports facility outright or operating venues for others, with the criteria that decide between them.
Read More
School projects fail on enrolment ramp, traffic, operator alignment and phasing rather than on construction. The recurring errors and the evidence that each has been closed.
Read More
Errors that cost foreign developers, contractors and suppliers in Saudi desalination and water treatment PPPs, with how to avoid each one.
Read More
Storage is planned last and complained about first. Six assumptions worth correcting before the design is fixed.
Read More
The signals inside a construction proposal that predict claims, delay and abandonment, and the specific question that turns each one into a priced answer before you sign.
Read More
Two routes into Saudi education compared for foreign investors: a private K-12 school and a vocational or professional training centre.
Read More