
The First Summer Inspection: A Worked Example of Defects and Retention
Many defects only appear after a building has been through heat, humidity and its first real use. This example costs them against the retention still being held.
Read More180 articles in Construction and Contracting with practical commercial and delivery insight.

Many defects only appear after a building has been through heat, humidity and its first real use. This example costs them against the retention still being held.
Read More
The final weeks decide whether defects get fixed or inherited. A structured handover sequence, with the documents that should change hands.
Read More
Speech privacy and noise complaints in an occupied building are solved in a sequence: measure, find the path, close the leak, then treat the room.
Read More
Company size is not a proxy for quality. What actually changes between a small team and a large firm, and which project types suit each.
Read More
A BMS is installed, commissioned and then quietly reduced to a screen nobody reads. The reasons are consistent and largely avoidable.
Read More
A programme is a claim about the future. This example shows how to test one before you accept it, using arithmetic rather than instinct.
Read More
Condensation, rising moisture, a leaking pipe and penetrating rain look similar on a wall and need completely different treatment.
Read More
Contractor insolvency rarely arrives without notice. The signals that appear on site weeks before anyone admits there is a problem.
Read More
Owners assume a warranty means someone will come and fix it. The conditions, exclusions and notification requirements usually decide otherwise.
Read More
Healthcare fit out is governed by requirements that residential buildings were never designed to meet, and the licence depends on them being satisfied before opening.
Read More
Bringing a contractor in before the design is finished can save money and time, or it can remove your competitive position. Six assumptions worth testing before you choose it.
Read More
The monthly comparison of what a contract has earned against what it has cost, worked through in illustrative riyals to show how a profitable job turns into a loss unnoticed.
Read More