Escape routes fail for mundane reasons: a locked door, a stored pallet, a light that was never tested on battery. Here is what inspectors keep finding.
An escape route is only as good as its worst point. In practice, buildings fail on the ordinary things: a door that was locked for security, a corridor used as storage, exit signs that cannot be seen from the far end, and emergency lights that work on mains but have never been proved on battery. None of these are design problems. They are management problems that design can either help with or make worse.
Why these keep happening
Escape provisions are designed once and then eroded by daily use. Security wants doors locked, cleaners want a place for equipment, tenants want the corridor for stock, and nobody owns the escape route as an asset. Because failures are invisible until there is an evacuation or an inspection, the erosion continues quietly for years. The pattern is not negligence so much as the absence of a named owner and a dated test record.
1. Final exit doors locked or obstructed for security
An exit that opens to a side street is a security weakness, so somebody fits a padlock, a chain or a bolt. Sometimes the obstruction is softer: a skip parked outside, a delivery crate, a staff car. The door still looks like an exit on the drawing and still carries its sign, but it cannot be used by a person moving in the dark with other people behind them.
- Avoid it by: Solve the security need with a monitored device that releases on alarm and on push, not with a lock.
- Proof it is closed: Walk every final exit monthly and record that it opened from the inside without a key.
What it costs you: A failed inspection at best, and a blocked route during an incident at worst.
2. Treating escape lighting as a fitting rather than a tested system
Emergency luminaires contain a battery and a charger, and both age. A fitting that illuminates during normal operation tells you nothing about whether it will run for its rated duration when the supply fails. Many buildings have never performed a full duration discharge, so the first real test happens during the first real power cut.
- Avoid it by: Run short functional tests regularly and a full duration test at the interval the standard sets.
- Proof it is closed: A test log naming each luminaire, the test date, the duration achieved and the remedial action.
What it costs you: Routes that go dark minutes into an evacuation instead of staying lit for the design period.
3. Lighting the route but not the decision points
Designers sometimes spread emergency luminaires evenly down a corridor and leave the places where people have to make a choice in shadow. The points that matter most are stair landings, changes of direction, level changes, door openings, the location of call points and extinguishers, and the final exit itself. Even illumination is not the objective; usable illumination at the points of decision is.
- Avoid it by: Review the emergency lighting layout against a walked route, not against a spacing rule.
- Proof it is closed: A night time walk with the mains isolated, photographed at each decision point.
What it costs you: Occupants hesitate or turn the wrong way exactly where delay is most dangerous.
4. Signage that is correct on paper and invisible in use
Exit signs get mounted where a ceiling grid allowed, hidden behind a bulkhead, blocked by a later partition or placed so they cannot be read from the approach direction. Tenants add their own signage that competes for attention. A sign only works if it is visible from the point where a person needs it, at the viewing distance its size supports.
- Avoid it by: Check sightlines from each end of every route after fit out, not only at first handover.
- Proof it is closed: A marked up floor plan showing from where each sign is readable.
What it costs you: People travel to the wrong stair and lose time retracing the route.
5. Allowing the escape route to become storage
Corridors and lobbies are tempting space. Stock, cleaning trolleys, retired furniture and delivery boxes accumulate because there is no alternative store and no visible rule. Combustible storage in an escape route also changes the fire load in exactly the place people must pass through, which makes it worse than an ordinary obstruction.
- Avoid it by: Provide a dedicated store in the fit out design and write the prohibition into every lease.
- Proof it is closed: A dated weekly route inspection with photographs filed by the facilities team.
What it costs you: Reduced effective width, higher fire load, and an immediate inspection finding.
6. Fit out works that quietly lengthen travel distances
A tenant adds partitions, a meeting room swallows an opening, a reception counter blocks a cross route. Each change is small and nobody reruns the travel distance calculation that justified the original exit arrangement. Over several tenancies the building drifts away from the fire strategy that was approved.
- Avoid it by: Make any layout change conditional on a written check against the fire strategy.
- Proof it is closed: A revised plan and a designer note confirming distances and exit widths still comply.
What it costs you: The approved basis of the building no longer matches the building as it stands.
A short check before you sign
- Open every final exit from the inside without a key and record the result with a date.
- Isolate the lighting circuit on one floor and walk the route to see what stays lit.
- Photograph each exit sign from the approach direction at the far end of the route.
- Measure the clear width at the narrowest point of each corridor as it is used today.
- Compare current floor plans against the approved fire strategy drawings for added partitions.
If it has already happened
If an inspection has already found problems, deal with them in order of consequence rather than in order of cost. Locked and obstructed exits come first because they are immediate and cheap to fix. Battery failures come next, since replacement is routine and the test record restores your position. Layout drift is last and slowest, because it may require a designer to revisit travel distances and, in some cases, a fresh submission. Requirements in this area are periodically updated, so confirm the current provisions with the reviewing authority before you specify remedial work, and ask a licensed adviser where a lease clause conflicts with what you must now enforce.
Domira works on buildings that already exist: surveying what is installed, specifying the systems that have to be replaced, and running maintenance and refurbishment work around the people using the property. Tell Domira which asset you are responsible for and we will say what we would inspect first.
Frequently Asked Questions
How long must emergency lighting stay on during a power failure?
The required duration is set by the applicable standard and the occupancy, and the design should state it explicitly on the drawings. The practical point for an owner is that the stated duration means nothing without a full discharge test proving the batteries still achieve it. Record each test, because batteries lose capacity gradually and a fitting that passed two years ago may not pass today.
Can an escape door be fitted with an access control lock?
Access control on an escape door is normally achieved with devices that release the door on fire alarm activation, on loss of power, and on a clearly marked break glass or push pad. A plain electric lock that holds under those conditions is not acceptable. Specify the release behaviour in writing, test it as part of the cause and effect matrix, and confirm the arrangement with the reviewing authority.
Who is responsible for keeping corridors clear in a leased building?
Responsibility usually sits with whoever controls the space, but the owner carries the consequences when common areas are obstructed. The workable answer is a lease clause prohibiting storage in escape routes, a dedicated store provided in the design, and a documented inspection routine by the building management. Without the inspection record, enforcement discussions with a tenant tend to go nowhere.