Contractor References and Site Visits: What They Prove and What They Do Not

Contractor References and Site Visits: What They Prove and What They Do Not

Domira Team August 3, 2025 4 min read

Why reference calls and site visits often reassure owners without testing anything, and how to run both so they produce evidence you can act on before appointment.

A reference supplied by a contractor is a marketing asset until you choose the projects yourself and ask narrow questions. A site visit is a courtesy tour until you look at the things nobody prepares: the record cupboard, the storage yard, the sealant on a two-year-old building. Both tests are worth running, and both are usually run in the way that guarantees a comfortable answer.

How to test a claim like this

Apply three filters to any reference or visit. Did you choose the project, or did the contractor? Were your questions specific enough that a vague answer would be obvious? And did you see something that the contractor could not have prepared for your arrival? A check that fails all three has produced a feeling, not information, and it will be quoted back to you as due diligence when the file is reviewed later.

Myth 1: A list of impressive projects proves the contractor can build mine.

Reality: A project list shows what the company has been involved in, not what it performed, at what quality, or with which people. Firms legitimately list projects where they held a small package, or where the work was done by staff who have since left. Relevance matters more than prestige: a modest residential building finished well is better evidence for your apartment block than a large civil contract.

How to check it yourself: For five listed projects, ask what scope the company held, who the client was, and whether the proposed site team worked on them.

Myth 2: References the contractor gives me are still useful.

Reality: They are useful, but only as a starting point, because they are selected. The valuable references are the ones you find yourself: a client from the project list you chose, a consultant who administered a contract, a supplier who can say whether invoices were paid on time. Suppliers are often the most candid source available, because payment behaviour is not a matter of opinion.

How to check it yourself: Pick two projects from the list yourself and contact those clients directly rather than using the supplied contacts.

Myth 3: Reference calls are polite conversations with no real content.

Reality: They are, when the questions are broad. Ask whether the client was satisfied and you will hear yes. Ask how many months late completion was, how far the final account moved from the contract sum, how many defects were open six months after handover, and whether they would appoint the same company for the same scope, and you will hear specifics or hear hesitation. Both are informative.

How to check it yourself: Write five numeric or yes-or-no questions before the call and ask exactly those.

Myth 4: Visiting a live site tells me about quality of work.

Reality: A live site tells you about discipline, which predicts quality: whether materials are stored off the ground and protected, whether reinforcement is clean, whether the site is tidy at the end of a shift, whether safety equipment is worn when nobody senior is watching, and whether inspection and test records are current and filled in on the day. Finished quality is judged on old buildings, not new sites.

How to check it yourself: Ask to see the inspection and test records and the materials store, not only the completed floors.

Myth 5: A completed showpiece building is the best thing to inspect.

Reality: The best thing to inspect is a building handed over two or three years ago, because time reveals what workmanship hid. Look at external sealant, paint at junctions, staining below windows, the falls on flat roofs and terraces, lift ride quality, water pressure at the top floor and the condition of car park drainage. These are the defects that reduce rents and generate owner complaints.

How to check it yourself: Insist on visiting one building at least two years old, ideally one you selected from the project list.

Myth 6: If I cannot travel, site visits have to be skipped.

Reality: They can be delegated. An engineer, development manager or consultant acting for you can visit with a written brief and report with photographs against a checklist. What cannot be delegated is the decision to require the visit at all. A video call tour controlled by the contractor shows you what the camera is pointed at, which is a different exercise.

How to check it yourself: Appoint a representative with a written inspection brief and require a photographic report against your checklist.

What this changes in your decision

  • Choose the projects you will check rather than accepting a curated reference list.
  • Prepare five narrow questions per reference call and record the answers in the evaluation file.
  • Visit one live site for discipline and one older building for durability.
  • Ask suppliers and consultants about payment behaviour, not only clients about satisfaction.
  • If you cannot attend, brief a representative in writing and require a photographic report.

Domira designs, builds and manages projects across Saudi Arabia for owners who are based abroad: land appraisal, feasibility, design, construction, handover and asset management under one accountable contract. Send us the plot or the brief and Domira will put the numbers in front of you before you commit.

Frequently Asked Questions

What questions should I ask a contractor reference?

Ask how many months late the project finished and why, how far the final account moved from the contract sum, how many defects were still open six months after handover, whether the site team stayed for the duration, and whether they would appoint the same company for the same scope again. Narrow questions produce usable answers; general satisfaction questions produce polite ones.

What should I look for when visiting a contractor active site?

Look at material storage and protection, cleanliness of reinforcement before pouring, whether safety equipment is actually worn, tidiness at the end of a shift, and whether inspection and test records are up to date rather than completed in batches. Ask the site engineer to explain one current problem. Discipline on these points predicts the quality of the finished building.

How old should a completed building be when I inspect a contractor work?

Two to three years is ideal, because a full summer and a rainy season have tested it. Look for external sealant failure, staining below windows, ponding on terraces, cracking at junctions, lift ride quality and drainage performance. A building inspected on handover day shows finishing skill; a building inspected years later shows whether the work beneath the finish was done properly.

Complimentary Consultation

Have a Property Question?

Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.