Townhouses and Duplexes in Saudi Arabia: What Developers Get Wrong

Townhouses and Duplexes in Saudi Arabia: What Developers Get Wrong

Domira Team June 23, 2025 4 min read

Attached housing looks like a cheaper villa and behaves like a different building type. Six assumptions about townhouses and duplexes, tested against what the build actually demands.

Townhouses and duplexes are chosen because they promise more units on the same land without the cost of an apartment block. That is partly true, but the savings arrive with a new set of technical obligations around party walls, acoustics, fire separation, drainage and ownership. Here are the assumptions that cause the most trouble, and how to test each one before you commit to the format.

How to test a claim like this

Test any claim about attached housing by asking what happens at the line between two homes. Every advantage of the format comes from sharing a wall, and every difficulty comes from the same place: sound, fire, structure, drainage, maintenance access and legal ownership all have to be resolved at that line. If a claim does not address the shared boundary, it is a marketing statement rather than a technical one.

Myth 1: A townhouse is just a narrower villa, so it costs proportionally less to build.

Reality: Cost per square metre often rises rather than falls. The shared wall has to meet acoustic and fire separation requirements, structure has to work with less external wall available for bracing, and services have to run without crossing into a neighbour. You save land and external envelope, then spend part of the saving on the boundary between units.

How to check it yourself: Ask your cost consultant to price the same total floor area as detached villas and as townhouses, with the party wall specification included in the second option.

Myth 2: Sound between attached units is a minor detail.

Reality: It is the single most common complaint in attached housing and the hardest to fix afterwards. Acoustic performance depends on the wall build-up, on how floors and ceilings meet it, and on whether a service penetration or a fixing has bridged it. One badly detailed socket box can undo an otherwise good wall.

How to check it yourself: Require an acoustic detail for the party wall including junctions and penetrations, and inspect the first completed pair before the rest are built.

Myth 3: Fire separation is handled automatically by the block work.

Reality: Separation has to be continuous from foundation to roof, including the roof junction and any void or service route that crosses it. Civil defence requirements govern how this is achieved and inspected, and a continuous roof space above a party wall is exactly the sort of detail that fails an inspection late in the programme.

How to check it yourself: Have the separation strategy drawn as a section through the party wall and roof, and confirm the current requirements with the authority through your designer.

Myth 4: Drainage and utilities can share a route between units to save money.

Reality: They can, and it creates a maintenance and dispute problem that lasts as long as the buildings. A blockage in a shared run means entering a neighbour to clear it, and a shared meter means an argument every month. Independent runs and independent meters cost more once and save trouble permanently.

How to check it yourself: Check the drainage and electrical layouts for any pipe, cable or meter serving one unit and passing through another.

Myth 5: Buyers see attached housing as a compromise, so specification can be lower.

Reality: Buyers choosing a townhouse or duplex are usually buying location and a private entrance at a price a detached villa cannot reach. They still expect a private outdoor space, secure parking, a normal kitchen and quiet bedrooms. The compromise they accept is the shared wall, not the standard of the house.

How to check it yourself: List what a competing apartment at the same price offers, and confirm your unit beats it on privacy, storage and outdoor space.

Myth 6: Ownership and maintenance of the shared elements will sort itself out.

Reality: Somebody has to be responsible for the party wall, the shared roof detail, any common access and the boundary treatment. Where units are sold individually, that responsibility should be written down before the first sale, and owners association arrangements may apply. Leaving that responsibility unrecorded creates a dispute that is difficult to resolve without documents.

How to check it yourself: Confirm with a licensed adviser and the relevant authority how shared elements will be owned and maintained, and put it in the sale documentation from unit one.

What this changes in your decision

  • Price the scheme both ways, detached and attached, with the party wall specification fully included.
  • Get the party wall drawn as an acoustic and fire detail including its junctions, before tender.
  • Give every unit independent drainage, power and water with its own meter, even where sharing is permitted.
  • Build the first pair as a prototype and test it for sound and cooling before repeating.
  • Settle ownership and maintenance of shared elements in writing before you sell or let a single unit.

Domira designs, builds and manages projects across Saudi Arabia for owners who are based abroad: land appraisal, feasibility, design, construction, handover and asset management under one accountable contract. Send us the plot or the brief and Domira will put the numbers in front of you before you commit.

Frequently Asked Questions

Is building townhouses cheaper per square metre than building detached villas in Saudi Arabia?

Not reliably. You save land and external wall area, then spend on party wall acoustics, fire separation and more constrained structure and services. The real saving is usually in land per unit rather than in build cost per square metre. Ask your cost consultant to price both options against the same total floor area before choosing the format.

How do you stop sound transferring between two attached homes?

With a wall build-up designed for acoustic performance and, more importantly, with the junctions and penetrations detailed so nothing bridges it. Floors, ceilings, roof junctions, socket boxes and service pipes are the usual weak points. Build one pair first, test it while you can still change the detail, and make that pair the contractual standard.

Who is responsible for the party wall in a duplex after the units are sold?

That depends entirely on how the sale and ownership documents are drafted, and it should be settled before the first sale rather than after a problem appears. Shared elements usually need a written arrangement covering maintenance and cost sharing, and owners association rules may be relevant. Take advice from a licensed adviser and confirm the registration position with the relevant authority.

Complimentary Consultation

Have a Property Question?

Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.