Six misunderstandings about how design responsibility works on a Saudi project, from who can submit a permit to who is liable for what is built.
Foreign owners frequently arrive with a designer they trust from another market and discover that the Saudi process expects a licensed local office to carry the submission and the technical responsibility. That is not an obstacle so much as a division of roles, and understanding it early avoids paying twice for the same drawings. These are the six beliefs that cause the most confusion.
How to test a claim like this
Ask two questions of any arrangement: who is licensed to submit and be responsible for the design in the Kingdom, and who carries professional liability if something is wrong once it is built. Then ask who is coordinating between the parties, and whether that coordination is in somebody's paid scope. Requirements for licensing and submission should be confirmed with the relevant authority, because they are not a matter of practice or preference.
Myth 1: My architect abroad can simply submit the drawings.
Reality: Submissions for a building permit run through a licensed office in the Kingdom, which takes technical responsibility for what is submitted. An overseas designer can lead the concept and the design intent, but the local office has to be genuinely engaged rather than used as a signature, because it is accountable for the content.
How to check it yourself: Confirm the licensing and submission requirements with the relevant authority before agreeing any split of roles.
Myth 2: Using a local office means losing control of the design.
Reality: It means defining the interface. Many projects run a concept designer and a licensed office of record successfully, with a written split of who produces what, who reviews, and who has final say on appearance against compliance. What causes problems is leaving the split implicit.
How to check it yourself: Write a responsibility matrix naming which party produces, reviews and approves each drawing package.
Myth 3: Two designers means paying twice.
Reality: There is duplication only if the scopes overlap. Pay the concept designer for design intent and the licensed office for technical development, compliance and submission, with one of them clearly leading. Where both produce the same package because nobody drew the line, you are paying twice and getting two versions.
How to check it yourself: Compare the two scopes side by side and remove any deliverable that appears in both.
Myth 4: The engineering office is responsible for everything once appointed.
Reality: Responsibility follows scope. A design office is responsible for its design, and its liability is shaped by its appointment and its professional indemnity cover. Contractor-designed elements, specialist subcontractor design and anything you instructed against advice sit elsewhere. Liability questions are for a licensed adviser rather than for assumption.
How to check it yourself: Read the liability and indemnity clauses in each appointment and ask your adviser what they actually cover.
Myth 5: Interior design and architecture can be treated as one appointment by default.
Reality: They are frequently separate scopes with separate deliverables, and the boundary between them is a common source of gaps: who specifies joinery, who locates sockets, who details the bathroom, who coordinates lighting with the ceiling. The boundary is cheap to define in advance and expensive to discover on site.
How to check it yourself: Ask for an explicit list of which package covers each interior element before either appointment is signed.
Myth 6: A permit approval means the design is fully checked.
Reality: An approval confirms that the submission satisfied the requirements applied in that process. It is not a guarantee that the design is buildable, coordinated, efficient or within your budget, and it says nothing about whether the specification suits your commercial objective. Those remain your concerns and your consultants concerns.
How to check it yourself: Run your own completeness and coordination review before tender, independent of the approval outcome.
What this changes in your decision
- Confirm licensing and submission requirements with the relevant authority before structuring the design team.
- Write a responsibility matrix for every drawing package before appointments are signed.
- Remove duplicated deliverables between an overseas concept designer and the local office.
- Ask a licensed adviser what the liability and indemnity provisions in each appointment cover.
- Treat an approval as a compliance milestone, not as a quality or budget check.
Domira designs, builds and manages projects across Saudi Arabia for owners who are based abroad: land appraisal, feasibility, design, construction, handover and asset management under one accountable contract. Send us the plot or the brief and Domira will put the numbers in front of you before you commit.
Frequently Asked Questions
Can a foreign architect design a building in Saudi Arabia?
An overseas designer can lead the concept and design intent, but submissions and technical responsibility run through a licensed office in the Kingdom, which must be genuinely engaged in the work. Confirm the current licensing and submission requirements with the relevant authority, and define in writing which party produces, reviews and approves each package.
Who is responsible if a building does not comply with the Saudi Building Code?
Responsibility depends on scope and on the appointments: the design office for its design, specialist designers for their elements, and the contractor for building in accordance with the documents. Because the allocation is contractual and regulatory at the same time, ask a licensed adviser to explain where liability sits in your particular arrangement before you sign.
Does a building permit mean my design is checked and safe to build?
It means the submission met the requirements applied in that process. It is not confirmation that the drawings are coordinated, buildable, efficient or within budget, and it does not review whether the specification suits your commercial goals. Those checks are yours to commission, ideally as an independent completeness review before documents go out to tender.