Something was built that is not in the permit file, and the buyer surveyor has just found it. What happens next depends almost entirely on how the seller responds.
An extra room, an enclosed terrace, a mezzanine, an additional floor or a converted outbuilding appears on site and not in the permit record. It is a common finding and it is not automatically fatal to a sale. What turns it into a dead transaction is the handling: denial, delay, informal reassurance and a seller who treats a documented gap as an opinion. The mistakes below belong to both sides.
Why these keep happening
The structure was usually built by a previous owner, often years ago, and everyone involved has treated it as normal because it has been there and nobody has objected. The seller therefore experiences the buyer finding as an obstruction rather than as a finding, and responds defensively. Meanwhile the buyer lender or adviser has a documented discrepancy that cannot be unseen, and the transaction stalls between two people with incompatible frames.
1. The seller asserts it is fine without producing anything
Statements that it has always been there, that everyone in the street has one, or that nobody minds are not evidence of anything. They also consume the goodwill and the timetable that could have been spent establishing the actual position, which is usually more favourable than the argument suggests.
- Avoid it by: Respond to a documented finding with a document: the permit file, a surveyor report, or advice on the route to regularise.
- Proof it is closed: A written position from a consultant, sent within days of the finding.
What it costs you: Weeks lost and a buyer who now doubts everything else they have been told.
2. The buyer treats it as a reason to withdraw immediately
Many unpermitted additions can be regularised or removed, and the issue is cost and time rather than impossibility. A buyer who withdraws on the finding alone may be walking away from an asset they could have bought at a reduced price with the matter resolved by the seller.
- Avoid it by: Ask for a costed assessment of regularisation or removal before deciding anything.
- Proof it is closed: A consultant note setting out options and indicative costs, obtained before any decision.
What it costs you: A good purchase abandoned, and the diligence spend wasted.
3. Nobody establishes which category the addition falls into
There is a difference between work that could be approved but was not, work that cannot be approved because it breaches a requirement, and work that affects structure or safety. The three have different remedies and different costs, and treating them as one issue produces either panic or complacency.
- Avoid it by: Have a competent consultant classify the work before anyone negotiates about it.
- Proof it is closed: A written classification with the relevant requirement identified for each element.
What it costs you: A response calibrated to the wrong problem.
4. Agreeing a price reduction instead of resolving it
A discount transfers the problem to the buyer along with the asset. The buyer then owns an unpermitted structure, faces the same question on their own resale, and carries whatever exposure attaches to it. The discount is almost never calculated against the full cost of that position.
- Avoid it by: Where possible, require resolution before completion, with the seller carrying out the work.
- Proof it is closed: A contractual condition requiring the position to be regularised or the work removed before completion.
What it costs you: An inherited problem priced as a one off discount rather than a recurring issue.
5. Proceeding on an informal assurance from someone local
Buyers are frequently told that the matter can be handled, often by someone with no authority to say so. An assurance that is not in writing from a party who can give it is worth nothing at the moment it is needed, which is usually on the buyer own resale years later.
- Avoid it by: Require written confirmation from a party with authority, obtained through a licensed adviser.
- Proof it is closed: Written confirmation on file, naming who gave it and on what basis.
What it costs you: A decision taken on a reassurance that cannot be produced when it matters.
6. Ignoring the effect on finance and on valuation
A lender valuing the property may exclude unpermitted area, or may decline to lend at all until the position is clear. A buyer who has agreed a price on the full measured area then finds the lending does not support it, usually at the point when deposits are already committed.
- Avoid it by: Raise the finding with the lender and the valuer early rather than hoping it goes unnoticed.
- Proof it is closed: Written confirmation of how the lender and valuer are treating the area in question.
What it costs you: A funding shortfall discovered after the buyer is financially exposed.
7. Failing to record the resolution for the next sale
The matter is addressed somehow and nobody assembles the file. Three years later the next buyer surveyor makes the same finding, and the current owner has nothing to produce. The problem is therefore solved once per transaction, forever.
- Avoid it by: Assemble a closure file with the classification, the work, the approvals and any confirmation obtained.
- Proof it is closed: A single indexed file held with the title documents.
What it costs you: The same discovery repeating at every future sale.
A short check before you sign
- Has a competent consultant classified the work rather than anyone asserting a view about it?
- Do I hold a costed assessment of regularising versus removing?
- Is any assurance I am relying on in writing and from a party with authority?
- Have the lender and the valuer been told, and do I have their written treatment of the area?
- Is resolution a contractual condition rather than a price adjustment?
- Will a closure file exist afterwards that the next buyer can be shown?
If it has already happened
If you already own a property with an unpermitted addition, deal with it on your own timetable rather than during a sale, when you have no leverage. Start with a classification from a competent consultant, then take advice on the route available for that category of work. Requirements and the routes for addressing historic work are revised from time to time, so have a licensed Saudi adviser confirm the current position rather than acting on what applied to a neighbour some years ago.
Domira works on the ownership side of a Saudi property for owners based abroad: verifying title and boundaries, assessing the building, handling registration and handover, and managing the asset afterwards. For legal and tax questions, work with a licensed adviser; Domira will tell you plainly what the property itself supports.
Frequently Asked Questions
What happens if a property has an extension built without a permit?
It depends on the category: work that could have been approved but was not, work that breaches a requirement and cannot be approved as built, and work affecting structure or safety. The remedies and costs differ for each. Get a competent consultant to classify it before anyone forms a view on how serious it is.
Can I still sell a property with unpermitted building work?
Often yes, but expect it to be found by any competent buyer surveyor and to affect valuation and lending. The transactions that fail are the ones where the seller responds with assertion rather than with a document. Deal with it before marketing, on your own timetable, where you have options and leverage.
Should a buyer accept a discount instead of having the work regularised?
A discount hands you the problem along with the asset, and you will meet it again on your own resale. Where resolution before completion is possible, that is almost always the better outcome, with the seller carrying out the work as a contractual condition. If you do take a discount, price it against the full cost of resolving it yourself.
Have a Property Question?
Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.




