How Foreign Developers Enter Saudi Solar: From Prequalification to Commercial Operation

How Foreign Developers Enter Saudi Solar: From Prequalification to Commercial Operation

Domira Team June 26, 2026 4 min read

The stages a foreign developer or investor follows to take part in utility-scale solar projects in Saudi Arabia, and the approval gate at each one.

Utility-scale solar in Saudi Arabia is procured through competitive tenders for independent power producers, where the winner builds and operates the plant and sells power under a long-term purchase agreement with the state offtaker. The government's target is for renewables to supply half of electricity by 2030, and part of the capacity is also delivered through the Public Investment Fund's partnerships. Foreign developers enter by prequalifying, forming a consortium and bidding, or by joining a winner as an equity partner, contractor or supplier.

Before stage one

Solar tenders in the Kingdom are competitive and tariffs have been bid very low, so entry only makes sense for a developer with strong balance sheet backing, access to low-cost finance and a supply chain that can meet local content conditions. Decide early whether you want to lead bids, take a minority stake, or supply equipment and services to the winners.

  • A track record of delivering and operating utility-scale solar that meets prequalification criteria.
  • Relationships with lenders familiar with Saudi power purchase agreements.
  • A view on local content requirements for modules, structures and services.
  • An understanding of how the procurement round is run and by which entity.
  • Capacity to post bid bonds and performance security.

Stage 1: Monitor rounds and prequalify

Follow announcements from the Ministry of Energy and the power procurement entity, and submit prequalification documents showing technical and financial capability.

  • Deliverable: Prequalification status for the round.
  • Owner: Business development lead.
  • Approval gate: Prequalified as a lead developer or as a consortium member.

Stage 2: Form the consortium

Assemble equity partners, often including a Saudi partner, and line up the engineering contractor and key suppliers.

  • Deliverable: Consortium agreement and exclusivity with contractors.
  • Owner: Developer with legal counsel.
  • Approval gate: Roles, equity shares and decision rules agreed in writing.

Stage 3: Prepare the bid

Model energy yield using site data, price equipment and construction, structure debt, and review the draft power purchase agreement and other project documents.

  • Deliverable: A priced bid with the financial model and lender support letters.
  • Owner: Bid team.
  • Approval gate: Internal investment committee approval of the tariff and risk positions.

Stage 4: Award and sign project agreements

If selected, negotiate and sign the power purchase agreement, land and connection agreements and any government support documents.

  • Deliverable: Signed project agreements.
  • Owner: Developer and counsel.
  • Approval gate: All conditions precedent to financing identified and assigned.

Stage 5: Reach financial close

Finalise loan agreements, hedging, insurance and security, and satisfy lender due diligence.

  • Deliverable: Financial close and first drawdown.
  • Owner: Finance team with lenders.
  • Approval gate: Independent engineer and lenders satisfied with the design and contracts.

Stage 6: Construct and connect

Build the plant, install modules and inverters, complete the grid connection works and pass testing with the grid operator.

  • Deliverable: Plant completed and tested.
  • Owner: Engineering contractor supervised by the owner's engineer.
  • Approval gate: Commercial operation certificate issued under the agreement.

Stage 7: Operate for the contract term

Run operations and maintenance, clean modules against dust, manage availability and report under the agreement.

  • Deliverable: Energy delivered in line with the contracted performance.
  • Owner: Operations company.
  • Approval gate: Availability and performance tests met each year.

Handovers between stages

Value is most often lost between bid and financial close. A tariff bid on optimistic module prices or yield assumptions has to survive lender due diligence and real procurement, and any gap comes out of equity returns. Keep the procurement and finance teams responsible for the numbers they supplied at bid stage through to close.

How you know it is finished

The investment is established when the plant has reached commercial operation, debt is in place on the agreed terms, operations meet contracted availability, and the company has the local staff and supply chain to run for the full term of the agreement.

If a Vision 2030 programme or market trend is shaping your investment case, Domira can test it against real land, construction costs and local demand in the city you are considering before you commit capital.

Frequently Asked Questions

How do foreign companies invest in Saudi solar projects?

Most take part through competitive tenders for independent power producer projects, either as a lead developer, a consortium partner or an equity investor alongside a winner. Others supply modules, structures, engineering or maintenance services. Prequalification criteria and local content conditions are set for each round, so read the documents for the round you are targeting.

Who buys electricity from solar plants in Saudi Arabia?

Utility-scale plants typically sell electricity to a state-owned offtaker under a long-term power purchase agreement, which gives lenders a creditworthy counterparty. Some projects in giga-project areas have their own utility arrangements. Confirm the offtaker, the term and the payment mechanism in the project documents of each tender.

Can businesses in Saudi Arabia buy solar power directly?

Frameworks exist for small-scale solar installations on buildings and for some private arrangements, but the rules on connection, export to the grid and private supply are set by the electricity regulator and have evolved. Check the current regulations and the connection process with the utility before designing a system.

What risks do solar investors face in Saudi Arabia?

The main risks are thin margins from aggressive bidding, module price and currency movements between bid and purchase, dust and heat reducing output, grid connection delays and local content compliance. The long-term purchase agreement reduces demand risk but does not remove construction and performance risk.

Complimentary Consultation

Have a Property Question?

Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.