Service charges are quoted as a number and questioned only when they rise. What they cover and how to assess whether they are reasonable.
Service charges are the ongoing cost of owning in a shared building, and they are frequently examined only after purchase. They affect both your net return and the property's attractiveness when you sell, which makes them worth understanding before you buy.
What this number does and does not include
This covers the recurring costs of operating and maintaining a shared residential building. It excludes costs inside your own unit and any one-off assessments for major works, which are a separate consideration.
Cleaning and common area upkeep
Daily cleaning of lobbies, corridors and shared facilities, which is the most visible part of what residents pay for.
- Pushes it up: Extensive common areas, poor specification of original finishes and high resident turnover.
- Brings it down: Efficient common area design and durable finishes chosen during construction.
- How to control it: Visit the building at different times before buying. The state of the common areas tells you what the charge is delivering.
Building systems maintenance
Lifts, pumps, water tanks, generators and central cooling where present, along with their servicing contracts.
- Pushes it up: Ageing equipment, deferred maintenance and systems approaching replacement.
- Brings it down: Planned maintenance, which reduces both failures and the cost of eventual replacement.
- How to control it: Ask about the age and service history of the lifts and main systems, since their replacement is the largest foreseeable cost in most buildings.
Utilities for common areas
Electricity for lighting, lifts and pumps, and water for common use and landscaping.
- Pushes it up: Inefficient lighting, extensive landscaping and poor controls.
- Brings it down: Efficient fittings and sensible controls, which are inexpensive to install and reduce cost permanently.
- How to control it: Ask whether any efficiency measures have been implemented, since these directly reduce a recurring cost.
Security and access
Security staff where present, access control systems, cameras and their maintenance.
- Pushes it up: Staffed security around the clock and extensive system coverage.
- Brings it down: Well-designed access control reducing the staffing requirement.
- How to control it: Consider what level of security the building genuinely needs, since this is often the largest staffed cost.
Management fee and administration
The cost of managing the building, collecting charges, arranging maintenance and reporting to owners.
- Pushes it up: Complex buildings and arrangements with poor collection rates requiring additional effort.
- Brings it down: Good collection rates and clear arrangements.
- How to control it: Ask to see the budget and actual expenditure. A management that cannot produce these is not managing to a budget.
Reserve fund contribution
Money set aside for major future works such as lift replacement, facade repair or waterproofing renewal.
- Pushes it up: Ageing buildings and systems approaching end of life.
- Brings it down: Nothing. A building with no reserve is not cheaper, it has deferred the cost.
- How to control it: Ask the reserve balance and what major works are anticipated. A low reserve in an older building signals a future assessment.
Costs that never appear on the first page
- Special assessments for major works not covered by the reserve.
- Arrears by other owners, which increase the burden on those who pay.
- Charges continuing during any period your unit is vacant.
- Increases following a change of management or a decision to restore deferred maintenance.
Keeping the budget honest
Assess service charges against the building's condition and reserve position, not against the number alone. A higher charge in a well-maintained building with a healthy reserve is usually better value than a low charge in a building deferring everything.
- Before buying, reviewing the budget, actual expenditure and reserve balance.
- Annually, comparing charges against the condition of the common areas.
- When a major system approaches end of life, since this is when reserves are tested.
- When considering a sale, since high charges or a weak reserve affect buyer interest.
If you are buying, selling or investing, Domira can verify the documents, assess the property and build the numbers with you before you commit to a transaction.
Frequently Asked Questions
What should I ask before buying an apartment?
The current annual charge, the budget and actual expenditure for recent years, the reserve balance, any planned major works, the arrears position, and the age of the lifts and main systems. Together these tell you whether the charge is sustainable or about to rise.
Can service charges increase significantly?
Yes, particularly where maintenance has been deferred, where a major system requires replacement, or where a new management restores standards that had slipped. This is why the reserve position matters as much as the current charge.
Do service charges affect resale value?
They do. Buyers assess total cost of ownership, and a high charge reduces what a purchaser is willing to pay for the unit itself. A building with a strong reserve and visible maintenance supports value even when its charge is not the lowest available.
Have a Property Question?
Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.





