Which hires in Saudi Arabia need professional accreditation, from engineers to healthcare staff, and the cost elements employers should plan for.
Many professions in the Kingdom require registration with a professional body before the person can practise: engineers with the Saudi Council of Engineers, healthcare practitioners with the Saudi Commission for Health Specialties, accountants with the Saudi Organization for Chartered and Professional Accountants for regulated work. The Ministry of Human Resources and Social Development has also run professional verification programmes for workers in listed occupations. Budget time and cost for these before a hire can start.
What this number does and does not include
The breakdown covers the cost of getting a new hire accredited or verified so they can work in their occupation. It excludes general visa and iqama costs, and the cost of training to pass exams where a hire needs it.
Primary source verification
Verification of degrees, licences and experience with the issuing institutions, often through a verification provider.
- Pushes it up: Degrees from many institutions and long work histories.
- Brings it down: Recent, well-documented qualifications.
- How to control it: Start verification before the visa, where the process allows.
Registration and classification fees
Fees charged by the professional body for registration and classification of the professional.
- Pushes it up: Senior classifications and additional specialties.
- Brings it down: Registering only in the specialty the role needs.
- How to control it: Check the fee schedule of the body for the classification you need.
Exams and assessments
Professional exams or tests required for some classifications.
- Pushes it up: Retakes.
- Brings it down: Preparation support.
- How to control it: Ask the candidate about exam requirements before the offer.
Membership renewals
Annual or periodic renewals of registration.
- Pushes it up: Multiple professionals and specialties.
- Brings it down: Few renewals if registrations align.
- How to control it: Add renewal dates to the same calendar as iqama renewals.
Continuing professional development
Some bodies require continuing education hours for renewal.
- Pushes it up: Healthcare and engineering roles with strict requirements.
- Brings it down: In-house training that counts toward the requirement.
- How to control it: Track hours per professional through the year.
Translation and attestation
Translated and attested degrees and certificates for the application.
- Pushes it up: Documents from several countries.
- Brings it down: Batching with the visa document pack.
- How to control it: Prepare one pack used for visa and accreditation.
Delay cost
Salary and project cost while a hire waits for accreditation before practising.
- Pushes it up: Starting the process after arrival.
- Brings it down: Starting before arrival.
- How to control it: Plan accreditation into the hiring timeline.
Costs that never appear on the first page
- Occupation on the visa not matching the accreditation, requiring changes.
- Candidates who cannot pass the required exam.
- Projects that need accredited staff to sign documents.
- Lapsed registrations discovered during a tender or inspection.
- Time of HR staff chasing verifications.
Keeping the budget honest
For every role in a regulated profession, add accreditation time and cost to the hiring plan and start it before arrival. Ask candidates about their registration history and exams at interview, and make offers conditional where accreditation is essential to the job.
- Which roles need professional registration or verification?
- Has verification started before the visa?
- Do the visa occupation and accreditation match?
- Are renewals in the compliance calendar?
Domira works with foreign investors on the property side of entering Saudi Arabia: finding land or premises, due diligence, design, construction and asset management. For licensing, tax and legal steps, work with a licensed adviser; we coordinate with yours so the property decision fits the structure you choose.
Frequently Asked Questions
Do engineers need accreditation to work in Saudi Arabia?
Engineers practising in the Kingdom need to register with the Saudi Council of Engineers, and accreditation is linked to residency processes for engineering occupations. Requirements include verification of qualifications and possibly exams, depending on classification. Check current requirements with the Council before the hire starts.
How do healthcare workers get licensed in Saudi Arabia?
Healthcare practitioners register with the Saudi Commission for Health Specialties, which verifies qualifications and experience and may require exams, before they can practise. Employers should start the process early, since it can take longer than the visa.
What is professional verification in Saudi Arabia?
The Ministry of Human Resources and Social Development has run programmes to verify the qualifications and skills of expatriate workers in listed occupations, linked to visa and residency processes. Which occupations are covered and what is required have been expanded in phases. Check whether your roles are included before recruiting.
Can a foreign engineer work in Saudi Arabia before accreditation is finished?
In regulated professions the professional is generally expected to hold valid registration before practising, and some residency steps for engineering occupations have been linked to accreditation. Where a hire arrives before registration is complete, keep them in tasks that do not require a licensed professional, and never let them sign drawings or approvals. Check the current rule with the Saudi Council of Engineers.
Have a Property Question?
Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.




