The first year carries costs that do not recur and reveals costs that do. A realistic picture for a new owner.
New owners budget for the purchase and are surprised by the first year, which combines setup costs, deferred maintenance from the previous owner and the discovery of what the property actually costs to run.
The situation
A family has purchased a fifteen year old villa and wants to understand what the first year of ownership is likely to cost beyond the purchase itself.
Assumptions (illustrative)
- Purchase price: SAR 1,100,000, already paid.
- Inspection findings requiring attention: SAR 45,000.
- Furnishing and immediate needs: SAR 60,000.
- Assumed annual electricity: SAR 18,000.
- Assumed annual water: SAR 4,500.
- Assumed insurance: SAR 3,200.
- Assumed routine maintenance and servicing: SAR 8,000.
- Assumed one unforeseen repair: SAR 12,000.
- All figures are illustrative assumptions used to demonstrate the method.
Step 1: One-off setup costs
SAR 45,000 remedial plus SAR 60,000 furnishing equals SAR 105,000.
These do not recur, but they arrive immediately after the purchase has consumed most available capital.
Step 2: Recurring costs
SAR 18,000 plus SAR 4,500 plus SAR 3,200 plus SAR 8,000 equals SAR 33,700.
This is the baseline annual cost of owning and running the property, before anything goes wrong.
Step 3: The unforeseen repair
SAR 12,000, bringing the year to SAR 150,700 beyond the purchase.
Something requires attention in most first years, particularly in older properties, and it is not genuinely unforeseeable.
Step 4: What this means for the reserve
A buyer who committed every available riyal to the deposit now faces SAR 150,700 with no reserve.
This is why the reserve matters more than the marginal reduction in financing cost a larger deposit would have produced.
Step 5: The second year
Without setup costs, the second year is closer to SAR 40,000 including a maintenance allowance.
The first year is not representative, which is worth knowing before concluding that the property is unaffordable.
Step 6: Planning for the fifth year
Air conditioning replacement and external redecoration are likely within five years, adding a substantial one-off cost.
Spreading known future replacements across the intervening years converts a shock into a plan.
What changes the answer
- A newer property reduces both remedial and maintenance costs substantially in early years.
- An apartment replaces individual maintenance with service charges, which changes the profile rather than the total.
- Deferring the inspection findings increases cost later rather than avoiding it.
- Higher cooling costs in a poorly insulated property can exceed this example considerably.
What the numbers tell you
- Budget the first year separately, since it combines setup and discovery.
- Keep a reserve through the purchase rather than committing everything to the deposit.
- Address inspection findings early, particularly anything involving water.
- Build a replacement schedule for major equipment rather than waiting for failure.
Limits of this example
Every figure above is an illustrative assumption used to show the method, not a quote, valuation or market rate. Costs, rates, fees and regulations change and must be confirmed with the relevant authority, lender or supplier before you commit.
If you are buying a finished property, Domira can inspect it, verify the documentation and price the findings with you before you commit.
Frequently Asked Questions
Is the first year always the most expensive?
Usually, because it combines furnishing, remedial work and the discovery of deferred maintenance. Years in which major equipment is replaced can exceed it, which is why a replacement schedule is worth building early.
How much reserve should a new owner keep?
Enough to cover the setup costs identified during inspection plus an allowance for at least one unforeseen repair. Buyers who plan this before completion avoid the position where the first problem becomes a borrowing decision.
Should I fix everything in the first year?
Address anything involving water, safety or that will worsen if deferred. Cosmetic work can wait until you have lived in the property and understand how you actually use it, which frequently changes what you would have chosen.
Have a Property Question?
Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.






