Electrical work is cheap while walls are open and expensive afterwards. The decisions that owners regret once the house is finished.
Electrical installation is decided during first fix, when the house is a shell and nobody has lived in it yet. That is the worst possible moment to imagine daily life, and it is the only moment when changes are cheap.
Why these keep happening
Almost every regret here comes from planning the electrical layout against a drawing rather than against how the rooms will be used, and from postponing decisions that become permanent the day plastering begins.
1. Positioning outlets without a furniture layout
Furniture is chosen later, so outlets are distributed evenly to be safe.
- Avoid it by: Produce a furniture layout before first fix and position power and data against it, room by room.
- Proof it is closed: A marked-up furniture plan signed off before conduits are installed.
What it costs you: Sockets end up behind wardrobes and beds while the areas people actually use rely on extension leads for the life of the house.
2. Under-providing circuits for future load
The current appliance list looks modest, and additional circuits add cost at a stage when the budget is under pressure.
- Avoid it by: Size the distribution board with spare ways, and run spare conduits to areas likely to change.
- Proof it is closed: A distribution board schedule showing spare capacity and the spare conduit routes recorded on the as-built drawings.
What it costs you: Adding capacity later means opening walls or running surface conduit, and both are permanent compromises.
3. Lighting designed as a grid rather than for use
A regular grid of ceiling points is fast to draw and easy to install.
- Avoid it by: Plan lighting by activity: reading, cooking, circulation, and place switching where people enter and leave.
- Proof it is closed: A lighting layout showing circuits by use with switch positions marked on the furniture plan.
What it costs you: Rooms are lit uniformly and flatly, with no task lighting where it is needed and no control over mood or energy use.
4. Ignoring data and network infrastructure
Wireless networking is assumed to make cabling unnecessary.
- Avoid it by: Run structured cabling to key points and to ceiling positions suitable for access points, with a central location for equipment.
- Proof it is closed: A cabling layout with terminated points labelled and tested.
What it costs you: Large villas with thick walls have coverage gaps that no router placement solves, and retrofitting cabling means chasing walls.
5. No record of concealed routes
Everyone on site knows where the conduits are, until the project ends and they leave.
- Avoid it by: Photograph every wall and ceiling before plastering, with a scale reference, and keep the images with the as-built drawings.
- Proof it is closed: A photographic record indexed by room, delivered as part of the handover file.
What it costs you: Every future drilling or alteration is a guess, and the consequences range from an inconvenience to a serious hazard.
6. Deferring smart home decisions until after finishing
Smart systems feel like an accessory rather than infrastructure.
- Avoid it by: Decide before first fix whether you may want automation, and prepare the wiring even if devices are installed later.
- Proof it is closed: Switch positions confirmed with the required conductors, recorded on the as-built drawings.
What it costs you: Most systems need neutral wires at switches, additional cabling or specific back boxes, none of which can be added without opening walls.
A short check before you sign
- Has a furniture layout driven the outlet positions?
- Does the distribution board have spare ways and are spare conduits recorded?
- Is lighting planned by activity rather than as a uniform grid?
- Is structured cabling run to the points that matter?
- Do you have photographs of every wall before plastering?
If it has already happened
If the house is already plastered and something is missing, avoid improvised surface wiring. Prioritise safety-related gaps first, then consider which additions genuinely justify chasing walls. Many regrets can be mitigated with well-chosen fittings and furniture placement rather than by opening finished surfaces.
If you are preparing to build, Domira can review your drawings, scope and contractor offers before you commit, and supervise delivery against the programme and specification you agreed.
Frequently Asked Questions
How many socket outlets should a room have?
Count by use rather than by rule: the appliances that live there permanently, the ones used occasionally, and the positions where someone will sit and want to charge something. A layout produced this way is always more useful than a number applied uniformly to every room.
Is it worth running conduits for things I might never install?
Empty conduit is one of the cheapest things you can build and one of the most expensive to add later. Running spare routes to the ceiling of main rooms, to the garden and to the roof is a small cost during first fix that preserves options for years.
Who should approve the electrical layout?
You should, against your furniture layout, with the electrical engineer explaining the circuits and capacity. Approval by a drawing alone tends to produce a compliant installation that does not match how the house will actually be used.