A registered contract is only as useful as what was typed into it. The entries that decide disputes, and the ones landlords leave at their defaults.
Registering a lease takes minutes, which is exactly the problem: the fields that decide who pays for a failed water heater, how rent is paid, what the deposit covers and what happens at the end of the term get filled in at speed. A year later the contract is the only thing either party can point to, and it says whatever was typed rather than what was discussed.
Why these keep happening
The error is treating registration as an administrative formality rather than as the moment the agreement is fixed. Landlords negotiate warmly in person, then let someone else complete the contract, then rely on the conversation when a dispute arises. The second pattern is leaving defaults in place without reading them, which means the terms of your tenancy were chosen by whoever designed the form rather than by you.
1. Leaving the maintenance split open
Both parties assume the obvious division is understood.
- Avoid it by: State the split explicitly, with examples, and name a value threshold above which the landlord decides the contractor.
- Proof it is closed: A maintenance clause that a stranger could apply to a specific repair without asking either party.
What it costs you: Nothing is obvious once a cooling compressor fails or a water heater leaks. Without a written split between structural and equipment failures on one side and consumables, filters and damage from use on the other, every repair becomes a negotiation, and the party with more patience wins rather than the party who is right.
2. Payment dates and method left vague
The first payment is made in person and the pattern feels established.
- Avoid it by: Record the exact amounts, the dates and the account, and insist on bank transfer with a reference.
- Proof it is closed: A payment schedule in the contract and a bank record of every receipt.
What it costs you: A tenancy with no stated payment date and no named account produces late payments that are hard to characterise as late, and cash handovers with no record. By the time there is an arrears conversation, neither side can show what was due when, which makes the whole position harder to enforce.
3. No condition schedule attached
Photographs feel unnecessary between people who have just met pleasantly.
- Avoid it by: Attach a dated inventory with photographs and meter readings, signed by both parties at handover.
- Proof it is closed: A signed condition schedule referenced in the contract itself.
What it costs you: At the end of the tenancy there is no agreed starting point, so the deposit discussion becomes an argument about what was already marked. Landlords then either absorb damage or withhold a deposit they cannot justify, and both outcomes are worse than ten minutes of photography at the start.
4. The deposit described without saying what it secures
The word deposit feels self-explanatory.
- Avoid it by: Define what the deposit secures, how deductions are evidenced and the period for return after the final inspection.
- Proof it is closed: A deposit clause naming the permitted deductions and the return mechanism.
What it costs you: If the contract does not say whether the deposit covers damage, unpaid utilities, cleaning or arrears, and on what basis it is returned, the end of the tenancy is an argument with no reference point. Tenants expect it back in full; landlords apply it to whatever is outstanding.
5. Occupancy, subletting and use left unstated
The applicant described their household during the viewing.
- Avoid it by: State the permitted number of occupants, prohibit subletting without written consent and state the permitted use.
- Proof it is closed: An occupancy and use clause in the contract.
What it costs you: Units let to a small family and then occupied by a dozen people suffer accelerated wear, generate complaints from neighbours and breach building rules. Without a term on permitted occupancy and subletting, you are arguing about something you never agreed.
6. Utilities and service charges not allocated
The landlord assumes the tenant pays everything that is metered.
- Avoid it by: List each utility and charge and say who pays it, and record the meter readings at handover.
- Proof it is closed: A utilities schedule with meter readings attached to the contract.
What it costs you: Where a building has shared cooling, shared water or a service charge covering items the tenant benefits from, silence means an argument. Unpaid utility accounts also have a way of returning to the owner of the unit, which is a cost you did not price into the rent.
7. The end of the term not thought through
A year feels distant when a tenancy begins.
- Avoid it by: Record the notice arrangements, the renewal mechanism and the condition in which the unit is to be returned.
- Proof it is closed: Clauses dealing with notice, renewal and the state of the unit on return.
What it costs you: Renewal, notice and the condition in which the unit must be returned all arrive eventually, and a contract that is silent produces a scramble. Landlords who have not fixed a notice arrangement discover a unit is empty with no notice, or occupied with no renewal agreed.
A short check before you sign
- Does the contract say who pays for a failed appliance as opposed to a filter?
- Are the payment amounts, dates and receiving account all stated?
- Is a dated and signed condition schedule attached, with meter readings?
- Does the deposit clause say what it secures and how it is returned?
- Are permitted occupancy, subletting and use addressed?
- Is each utility and charge allocated to a named party?
If it has already happened
If a tenancy is running on a contract with gaps, start documenting from today: write to the tenant confirming the position on payments, maintenance and occupancy as you understand it, and ask them to confirm. Begin taking dated photographs of the common areas of the unit at each visit, and move payments to bank transfer with references if they are not already. At renewal, treat the contract as the main negotiation rather than an afterthought, and complete every field deliberately. Where a dispute has already arisen, the outcome will depend on the documents and on the rules applying at the time, so take advice from a licensed Saudi adviser rather than relying on what is customary. Requirements around lease registration and the obligations between the parties are updated periodically, so confirm the current position before you rely on it.
Domira handles the property side of a Saudi transaction end to end: inspecting the unit, reading the documents, valuing what is in front of you and managing the asset after handover. Tell Domira what you are buying, selling or letting and you will get a plain answer on what it is worth doing.
Frequently Asked Questions
Who pays for repairs in a Saudi rental, the landlord or the tenant?
The contract is the first answer, which is why leaving the split open causes so many arguments. A workable division puts structural and major equipment failures with the landlord and consumables, filters and damage from use with the tenant. Because the underlying obligations are set by the applicable rules and these are updated over time, confirm the current position and then write your split down explicitly.
What should be attached to a residential lease contract?
A dated inventory with photographs of each room and appliance, meter readings at handover, a schedule of what is included if the unit is furnished, and the utilities allocation. These attachments are what make the contract usable at the end of the tenancy, when the only question is what changed between handover and return.
Can I change the terms of a lease after it has been registered?
Changes to a running contract are a matter for agreement between the parties and for the applicable procedures, so you cannot simply apply a new term unilaterally. Practically, the renewal is the point at which terms get corrected. Where something urgent needs changing mid-term, document the agreement in writing and ask a licensed adviser how it should be reflected properly.
Have a Property Question?
Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.




