Property documents are paper, scattered and lost at exactly the wrong moment. Building a record that survives.
Property documentation is created across years by different parties and typically ends up distributed between a folder, an email account and the memory of whoever managed the project. A deliberate digital record takes little effort and repays it at every transaction.
Before stage one
Start with whatever exists rather than waiting for completeness, since a partial organised record is considerably more useful than a complete disorganised one.
- A single location decided for all property records.
- A simple folder structure agreed before filing begins.
- A backup arrangement, since a single copy is not a record.
- Someone responsible for keeping it current.
Stage 1: Gather what exists
Collect every document currently held: title, permits, drawings, warranties, contracts and correspondence.
- Deliverable: An initial collection in one place.
- Owner: Owner.
- Approval gate: Everything gathered before organising, since organising a partial set wastes effort.
Stage 2: Digitise and name consistently
Scan physical documents and adopt a naming convention that makes files findable years later.
- Deliverable: Digitised documents with consistent names.
- Owner: Owner.
- Approval gate: Names include date and subject rather than the scanner's default.
Stage 3: Organise by category
Structure by ownership, construction, maintenance, tenancy and financial records.
- Deliverable: An organised structure.
- Owner: Owner.
- Approval gate: Structure simple enough that someone else could navigate it.
Stage 4: Identify and fill gaps
List what is missing and obtain it while sources are still reachable.
- Deliverable: A gap list with actions.
- Owner: Owner.
- Approval gate: Gaps pursued rather than noted, particularly where the source may become unavailable.
Stage 5: Add the photographic record
Include photographs of concealed services, the property's condition and any work performed.
- Deliverable: A photographic record indexed by area.
- Owner: Owner.
- Approval gate: Photographs labelled, since unlabelled images are nearly useless years later.
Stage 6: Maintain and back up
Add documents as they arise and maintain a backup in a separate location.
- Deliverable: A current record with a backup.
- Owner: Owner.
- Approval gate: Updated as events occur rather than reconstructed later.
Handovers between stages
The record is most often lost at transitions: change of owner, change of manager, or a device failure with no backup. Each is foreseeable and each is addressed by having the record in more than one place.
How you know it is finished
The record is adequate when a buyer's adviser could be given access and find every answer, and when losing any single device would not lose the record.
If you are deciding what technology your project or business actually needs, Domira can assess the options against the problems you are trying to solve rather than against feature lists.
Frequently Asked Questions
What should be photographed in a property?
Concealed services before they are covered, the condition of each room at handover or purchase, any defect raised with a date, and work performed during ownership. These four cover most of what you will later wish you had.
How long should property records be kept?
For as long as you own the property and for a period afterwards, since questions can arise after a sale. Digital storage makes indefinite retention practical, which removes the need to decide what to discard.
Is cloud storage appropriate for property documents?
It provides accessibility and backup, which are the two qualities a record needs. Keep originals of documents that require them physically secured, and treat the digital copy as the working record.