An illustrative example of how an investor measuring returns in euros is affected by currency moves on a SAR investment, and what hedging and repatriation planning change.
Because the Saudi riyal is pegged to the US dollar, an investor whose home currency is the dollar faces little exchange rate risk while the peg holds, but an investor measuring returns in euros, sterling or another currency carries the full swing of the dollar against that currency. Repatriation itself is generally not restricted, but withholding tax, timing and transfer costs affect what arrives home. The example below uses invented figures.
The situation
A European investor puts equity into a Saudi company and expects to receive dividends and eventually sell the stake. They measure performance in euros. They want to see how a change in the euro against the dollar, and therefore the riyal, affects their return. Figures are illustrative and do not represent real exchange rates.
Assumptions (illustrative)
- Equity invested: SAR 10,000,000 (illustrative).
- Exchange rate at investment: EUR 1 equals SAR 4.00 (illustrative), so EUR 2,500,000 invested.
- Assumed annual dividend before withholding: SAR 800,000.
- Assumed withholding tax on dividends to the non-resident: 5 per cent (illustrative; confirm the actual rate and any treaty relief with ZATCA and your adviser).
- Assumed sale proceeds after five years: SAR 13,000,000.
- Exchange rate at sale: EUR 1 equals SAR 4.40 (the euro strengthens against the dollar in this case).
Step 1: Return in riyals
SAR 13,000,000 minus SAR 10,000,000 equals a gain of SAR 3,000,000, or 30 per cent before dividends.
In local currency the investment performs well.
Step 2: Annual dividend after withholding
SAR 800,000 times 95 per cent equals SAR 760,000 per year.
Withholding tax reduces the cash that leaves the Kingdom, which is why treaty relief matters.
Step 3: Sale proceeds in euros
SAR 13,000,000 divided by 4.40 equals about EUR 2,954,545.
The capital gain in euros is about EUR 454,545, or about 18 per cent, rather than 30 per cent.
Step 4: Currency effect on the gain
At the original rate of 4.00, proceeds would have been SAR 13,000,000 divided by 4.00, equal to EUR 3,250,000; the difference is EUR 3,250,000 minus EUR 2,954,545, equal to about EUR 295,455.
Almost EUR 300,000 of the return is lost to currency movement, with no change in the business.
Step 5: Dividends in euros
If the rate moves evenly, a rough average of 4.20 applied to five years of SAR 760,000 gives SAR 3,800,000 divided by 4.20, about EUR 904,762.
Dividends also lose value in euros as the euro strengthens.
Step 6: Total return in euros
EUR 2,954,545 plus EUR 904,762 equals about EUR 3,859,307, against EUR 2,500,000 invested, a gain of about EUR 1,359,307, or about 54 per cent over five years.
Still positive, but in riyals the same investment returned SAR 3,000,000 plus SAR 3,800,000, or 68 per cent.
What changes the answer
- If the euro weakens against the dollar instead, the investor gains from currency movement.
- For a dollar-based investor, the peg removes most of this effect while it holds.
- Hedging with forward contracts can fix part of the rate, at a cost that reflects interest rate differences between the currencies.
- Treaty relief can lower withholding tax, so check the treaty between Saudi Arabia and your home country.
- Timing of repatriation matters: dividends paid regularly spread the currency risk, while a large sale is exposed to the rate on one date.
What the numbers tell you
- Measure returns in the currency your investors use, not only in riyals.
- Remember that the peg links the riyal to the dollar, so your real exposure is to your currency against the dollar.
- Consider hedging the largest and most certain cash flows, such as planned dividends or a known sale.
- Plan withholding tax and treaty relief before setting up the holding structure.
- Keep repatriation documents in order so transfers are not delayed by bank checks.
Limits of this example
Every figure above is an illustrative assumption used to show the method, not a quote, valuation or market rate. Costs, rates, fees and regulations change and must be confirmed with the relevant authority, lender or supplier before you commit.
If a Vision 2030 programme or market trend is shaping your investment case, Domira can test it against real land, construction costs and local demand in the city you are considering before you commit capital.
Frequently Asked Questions
Can foreign investors repatriate profits from Saudi Arabia?
Saudi Arabia does not generally restrict the transfer of profits or capital abroad, and the Investment Law addresses investors' ability to transfer funds. Transfers go through banks, which apply their own compliance checks, and withholding tax may apply on dividends and other payments to non-residents. Confirm tax treatment with ZATCA and your adviser before structuring distributions.
Is there a risk the Saudi riyal peg will change?
The riyal has been pegged to the US dollar for decades, and SAMA has repeatedly stated its commitment to the peg, supported by foreign reserves. No policy is guaranteed forever, so investors with very long horizons may note the possibility. In practice, most foreign investors face a bigger currency risk from their home currency moving against the dollar.
How can I hedge currency risk on an investment in Saudi riyals?
Because the riyal is pegged to the dollar, investors often hedge their home currency against the dollar, where markets are deep, or use riyal forward contracts offered by banks. Hedging costs reflect interest rate differences and the tenor. Hedge cash flows you are confident about, such as planned dividends or a sale, rather than the entire value.
Have a Property Question?
Domira can help you navigate property, financing and investment decisions in Saudi Arabia. Speak with our team for an initial consultation.




