Most wall cracks in a new Saudi building are not structural. They come from dry blocks, weak mortar, missing ties and walls built before the frame stopped moving.
Blockwork is the trade an owner sees most of and inspects least. The failures are consistent across sites: blocks laid dry in summer so the mortar loses its water, mortar batched by shovel with no control, perpend joints left unfilled, no ties where the wall meets a column, and walls built hard up against a slab that has not finished deflecting. Each one produces cracking that later gets blamed on the plasterer or on settlement.
Why these keep happening
Blockwork is paid by area and built fast, and almost every control that improves it slows the gang down. Wetting blocks, filling every joint, placing ties, leaving a compressible gap at the soffit and letting the wall cure all cost minutes per square metre. Because the consequences surface after plaster and paint have hidden them, the trade rarely feels the result of its own shortcuts, which is why supervision at the time of laying is the only control that works.
1. Laying dry, hot blocks in summer
A dry concrete block in direct sun absorbs water out of the mortar within seconds of being laid. The mortar then has too little water left to hydrate, so it never reaches strength and the bond at the interface is weak. The wall looks normal and has a fraction of the adhesion it should have.
- Avoid it by: Follow the block manufacturer guidance on pre wetting, keep blocks shaded and stacked off the ground, and avoid laying in the hottest hours.
- Proof it is closed: A method statement covering block storage and wetting, plus site inspection of stacks and the condition of blocks at the point of laying.
What it costs you: Weak bond throughout the wall, cracking at joints, and in severe cases walls that have to be taken down.
2. Mixing mortar by eye with no gauge
Mortar proportions decide its strength, workability and water retention. A gang mixing with a shovel count varies batch to batch, and the common instinct is to add water to make it easier to work, which weakens it. Mortar that is stronger than the blocks is also a problem, because cracks then run through the blocks instead of the joints.
- Avoid it by: Use gauge boxes or a batching arrangement with a stated mix, control the water, and discard mortar that has stood beyond its working time.
- Proof it is closed: A specified mortar mix in the method statement and periodic site checks of batching plus any specified mortar testing.
What it costs you: Variable strength across one wall, cracking, and plaster that debonds over the weak areas.
3. Leaving perpend joints unfilled
Vertical joints are the slowest part of laying a block and the easiest to skimp, especially with hollow blocks where the joint is narrow. An unfilled perpend is a direct path for sound, for moisture on external walls, and for cracks to propagate, and it reduces the strength of the wall as a panel.
- Avoid it by: Make full joint filling an explicit requirement, inspect before plaster and reject walls with open perpends.
- Proof it is closed: Pre plaster inspection photographs of each wall showing joints fully filled.
What it costs you: Sound transmission between rooms, damp patches on external walls and visible crack lines after painting.
4. No connection between blockwork and the frame
A block wall built against a concrete column with nothing tying them together is a separate element that moves independently. The vertical line between the two opens up as soon as anything shrinks, and that line runs straight through the plaster and the paint.
- Avoid it by: Install the ties or starter bars shown on the drawings at the specified vertical spacing, and use a mesh or bead over the junction before plastering.
- Proof it is closed: Inspection records showing ties in place at the correct spacing before each wall is plastered.
What it costs you: The classic vertical crack at every column and the repeated repainting that follows it.
5. Building tight to the underside of the slab above
A suspended slab deflects over time under its own weight and the loads on it. A wall packed hard against the soffit receives some of that load, and because it was never designed to carry it, the result is horizontal cracking near the top of the wall or crushing of the top course.
- Avoid it by: Follow the detail for the head of the wall, which normally includes a compressible gap closed with a flexible material rather than hard packing.
- Proof it is closed: A detail drawing for the wall head and an inspection confirming the gap is formed and sealed as drawn.
What it costs you: Horizontal cracks along the top of walls throughout a floor, repaired and then reappearing.
6. Omitting lintels or bedding them inadequately
Openings need a lintel with sufficient bearing at each end onto solid blockwork. Short bearing, a lintel set on a part cut block, or a lintel omitted because the opening looked small, concentrates load at the opening corners, and cracks run diagonally from them.
- Avoid it by: Specify lintel type and minimum bearing for each opening size and check bearing lengths during inspection.
- Proof it is closed: An opening schedule with lintel references, checked on site before plastering begins.
What it costs you: Diagonal cracking from door and window corners, which is the most visible defect in a finished room.
7. Cutting chases carelessly for services
Electrical and plumbing chases cut after the wall is built remove material from a panel that was sized without them. Deep horizontal chases are the worst, because they cut across the wall. Chases cut back to back on opposite faces can leave almost nothing between them.
- Avoid it by: Plan service routes before the wall is built, limit chase depth and direction to the specification, and never allow opposing chases at the same position.
- Proof it is closed: A coordinated services drawing and an inspection of chases before they are filled.
What it costs you: Weakened walls, cracking along chase lines after plaster, and occasionally a need to rebuild sections.
A short check before you sign
- Blocks are stored off the ground, shaded, and conditioned as the manufacturer requires before laying.
- Mortar is gauged to a specified mix and its water content is controlled.
- All bed and perpend joints are fully filled, verified before plaster.
- Ties or starter bars connect every wall to the frame at the specified spacing.
- Wall heads are detailed with a compressible gap rather than packed solid.
- Lintels are present with adequate bearing at every opening.
- Chases follow a coordinated services drawing and respect depth limits.
If it has already happened
If cracking has already appeared after plaster, resist the instinct to fill and repaint, because the same crack will return in the same place. Map the cracks on a plan, note whether they are vertical at columns, horizontal near slab soffits or diagonal from openings, and let the pattern tell you the cause. Vertical lines at the frame point to missing ties or a missing mesh over the junction. Horizontal lines near the top of walls point to hard packing against a deflecting slab. Diagonals from openings point to lintels or to movement. Where the diagnosis is a construction defect, the repair normally means cutting out the plaster along the line, installing the missing detail, and making good with a mesh reinforced band. Where cracks are wide, growing, or run through blocks rather than joints, treat it as a structural question and get a structural engineer to look before any cosmetic work starts.
Domira builds and supervises projects across Saudi Arabia, and this is the level of detail its site teams work at. Send the drawings or the site, and Domira will tell you what the specification has to say before anyone prices it.
Frequently Asked Questions
Why do cracks appear where a block wall meets a concrete column?
Because the two materials shrink, expand and move differently, and because the wall is often built against the column with nothing connecting them. Without ties and without a mesh or bead bridging the junction under the plaster, the joint opens and the plaster cracks along it. The fix is in the detail at construction, not in the filler applied afterwards.
Should concrete blocks be wetted before laying in hot weather?
Follow the guidance for the specific block, because requirements differ between dense concrete blocks, lightweight blocks and autoclaved aerated products, and over wetting causes its own problems. The purpose is to stop the block drawing water out of the mortar before it hydrates. What is never acceptable is laying blocks that are extremely hot and bone dry in full summer sun.
What mortar mix should be used for blockwork?
The mix is set by the specification and depends on the block type, the exposure and whether the wall is loadbearing. A general principle is that mortar should not be stronger than the units, so that any movement is accommodated in the joints rather than cracking the blocks. Use the mix stated in your project documents and gauge it rather than estimating by shovel.
Can you leave a gap between the top of a block wall and the slab above?
Yes, and for non loadbearing partitions it is usually required, so the wall does not pick up load as the slab above deflects. The gap is formed as the detail shows and closed with a compressible material and a sealant or a fire rated product where fire separation is needed. The detail comes from the designers, since it affects fire and acoustic performance.